Hussein, A. R. and Moradinia, S. F. (2023) “Mitigating Time and Cost Overruns in Construction Projects: A Questionnaire Study on Integrating Earned Value Management and Risk Management”, Journal of Studies in Science and Engineering , 3(2), pp. 37–51. doi: 10.53898/josse2023323.